A flood control project at Pleasant Valley dam is projected to cost $1,840,000 today, have annual maintenance costs of $57,000, and have major inspection and upkeep after each 4-year interval costing $210,000. If the interest rate is 10%/year.
Determine the capitalized cost of Annual Maintenance.