Calculating NPV
A firm evaluates all of its projects by applying the NPV decision rule. A project under consideration has the following cash flows:
Year Cash Flow
0 -27,400
1 11,400
2 14,400
3 10,400
What is the NPV for the project if the required return is 12 percent?
At a required return of 12 percent, should the firm accept this project?
What is the NPV for the project if the required return is 24 percent?
What is the NPV for the project if the required return is 24 percent?
At a required return of 24 percent, should the firm accept this project?