A dry detention basin is to be designed for a 70 ha


A dry detention basin is to be designed for a 70 ha residential development. The runoff coefficient for the area is 0.3 and the average rainfall during the year is 4 cm. What is the necessary volume for the basin?

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: A dry detention basin is to be designed for a 70 ha
Reference No:- TGS0649279

Expected delivery within 24 Hours