Question: A cutting machine takes 10 minutes to cut a piece of component for a product. After cutting 200 pieces, the machine takes 5 minutes to be recalibrated. What is the setup time of the cutting process? The response must be typed, single spaced, must be in times new roman font (size 12) and must follow the APA format.