A company uses a two-variance analysis for overhead variances, flexible-budget and production-volume. The production-volume variance is the difference between the factory overhead applied at standard and:
a. Total factory overhead per the flexible budget.
b. Actual factory overhead incurred.
c. Total factory overhead per the master budget.
d. Fixed overhead incurred.