A company produces 4800 parts per day and sells them at approximately half of that rate. The set-up cost is Rs.1000 and carrying cost is Rs.5 per units. The annual demand is 480,000 units. Find:
(a) Optimal lot size
(b) Number of production run that should be scheduled per year
(c) Length of each production run