A company assigns overhead cost to completed jobs on the basis of 119% of direct labor cost.The job cost sheet for Job 313 shows $27,974 in direct materials has been used on the job and that $10,400 in direct labor cost has been incurred. A total of 1,450 units were produced in Job 313.
What is the total manufacturing cost
What is the unit product cost.