A 6-in.-thick concrete slab is to be formed using plywood supported on 2 × 8 (S4S) joists that are spaced 1 ft-6 in. on center. Find the maximum allowable stringer spacing if maximum allowable deflection is 1/240 of the span. Draw a sketch of the formwork.