A 1.5 m diameter culver (concrete barrel, well - rounded entrance) that is 20m long is installed on a slope of 2 percent. The design discharge is 9.5 m^3/sec and the inlet will be submerged but not the outlet. Determine the depth that will result upstream (above the invert) during the design flood event.