A 10,000 cubic yards fill along a forest road right of waywill be compacted using grid rollers to a unit weight of 120 poundsper foot cubed. the fill material will be hauled to the site in 12cubic yard dump truck that are tipically loaded to about 85% ofthere volume capacity. while in the truck bed, the fill material istipically rather loose and as been estimated to have a unit weightof 80 pounds per foot cubed. each truck dispatched to the projectcan haul 8 loads per day.
How many days will be required for fill construction if 2trucks, 4 trucks, or 6 trucks are dispatched to the project?