1 the center line elevation of the proposed


1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly:

2. A design engineer commissioned a test pit to determine the top of pipe elevation for a sewer extension project.  The existing sewer pipe is an 8-ft o.d. reinforced concrete pipe with wall thickness 10-in.  A back sight to a local benchmark with an established elevation of 45.66-ft is obtained with a level and a rod reading of 4.91-ft.

 A foresight is taken to a rod resting on the top of pipe with a reading of 12.43-ft.   

Calculate The invert elevation (ft) of the sewer pipe.

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: 1 the center line elevation of the proposed
Reference No:- TGS0287968

Expected delivery within 24 Hours