AGC Construction

Introductino to AGC Construction:

KEYED AGC CONSTRUCTION:

Only while the input video signal and fly back pulses are available and provide AGC voltage this circuit turns 'ON'. These circuit rums off during the nonexistence of the signals. These signals works like a key. Therefore this circuit is termed as keyed AGC. Fly back pulses are also known as keying pulses. Fly back pulses containing a value of 25V (p-p) from horizontal output transformer is rectified through IN4148 and a negative voltage is provided to the collector of the transistor. A negative video signal having a value of 2 V (p- p) is acquired and applied to the base of the transistor from detector stage. The positive voltage needed for the emitter is provided froni 12 Volts supply by AGC preset

CIRCUIT OPERATION:

Throughout the conduction of transistor, peak synchronizing pulses of 2V (p-p) video signal is amplified and acquired at the collector. The current flows by the diode and winding of LOT. It causes in charging of capacitor C, (because it is reverse biased). Approximately 1.5 to 4V AGC voltage is acquired.

DELAYED AGC CONSTRUCTION:

Very first, AGC voltage is applied to IF amplifier and so signal gain variations are controlled. For the highest reduction of noise, amplification in RF stage has to be highest. If a low gain RF signal is acquired, AGC voltage is delayed and then delivered to the RF amplifier. Therefore, RF signal is amplified to a maximum and noise is so reduced.

MERITS OF KEYED AGC:

1. Noise is decreased because the transistor becomes 'on' throughout the horizontal balancing period only and at other times, it becomes 'off.

2. Because short time constant AGC capacitor, AGC voltage is acquired even if a fast variation in signal strength (interference because of the passing of aero planes) and allow RF and IF amplifier to keep in signal strength constant.

3. This kind of AGC fast through reacts throughout fast change of stations and keep constant signal gain to generate stable picture and sound.

Latest technology based Electrical Engineering Online Tutoring Assistance

Tutors, at the www.tutorsglobe.com, take pledge to provide full satisfaction and assurance in AGC Construction homework help via online tutoring. Students are getting 100% satisfaction by online tutors across the globe. Here you can get homework help for AGC Construction, project ideas and tutorials. We provide email based AGC Construction homework help. You can join us to ask queries 24x7 with live, experienced and qualified online tutors specialized in AGC Construction. Through Online Tutoring, you would be able to complete your homework or assignments at your home. Tutors at the TutorsGlobe are committed to provide the best quality online tutoring assistance for Electrical Engineering homework help and assignment help services. They use their experience, as they have solved thousands of the Electrical Engineering assignments, which may help you to solve your complex issues of AGC Construction. TutorsGlobe assure for the best quality compliance to your homework. Compromise with quality is not in our dictionary. If we feel that we are not able to provide the homework help as per the deadline or given instruction by the student, we refund the money of the student without any delay.

©TutorsGlobe All rights reserved 2022-2023.