--%>

Short run for production

I have a problem in economics on Short run for production. Please help me in the following question. In short run for production: (1) Both variable and fixed costs exist. (2) Productive capacity might be adjusted. (3) Unprofitable firms shut down. (4) No fresh workers can be hired.

What is the most precise option from the above.

   Related Questions in Microeconomics

  • Q : Profit maximized by nondiscriminating

    A nondiscriminating unregulated monopolist maximizes profit by: (w) charging the highest price the market will bear. (x) often changing designs and building in planned obsolescence. (y) setting marginal costs equal to marginal revenue [MC = MR]. (z) s

  • Q : Labor Productivity The American workers

    The American workers tend to be much productive than their counterparts in the South America or Asia in part as they have: (i) Superior natural genetic endowments. (ii) Access to the better sports programming, that promotes the team-work. (iii) More capital to work wi

  • Q : Increase output to increase profit When

    When the last unit produced and sold adds $100 to revenue of a firm and $75 to its costs, this will: (a) increase output to increase profit. (b) reduce output to increase profit. (c) maintain similar level of output to maximize profit. (d) shut down.

    Q : Total fixed cost Total fixed cost: 1.

    Total fixed cost: 1. Fixed cost remains constant at each level of output ie it do not change with change in quantity.2. It can not be zero when output is zero.3. Its curve is parallel to X-aixs4.

  • Q : Highest hourly wages rate and lowest

    From the given choices, in given graph Glynn would be happiest at: (1) point a. (2) point b. (3) point c. (4) point d. (5) point e. 1669_Lab</span></p>
                                        </div>
                                        <!-- /comment-box -->
                                    </li>
   
   </td>
	</tr><tr>
		<td>
       
      <li>
                                        <div class=

    Q : Average variable costs of pure

    Average variable costs per generic brick of this pure competitor equal approximately: (i) $.02 (2 cents per brick). (ii) $.04 (4 cents per brick). (iii) $.07 (7 cents per brick). (iv) $.09 (9 cents per brick).

  • Q : Problem on Substitute Goods Can someone

    Can someone help me in finding out the right answer from the given options. The substitute goods are: (i) Usually consumed altogether. (ii) Inferior to luxury goods. (iii) Generally free goods. (iv) Replacements for each other.

    Q : Produce output by profit-maximizing

    Unless this chooses to shut down since demand never exceeds average variable costs, in that case a profit-maximizing monopolist makes output where: (i) marginal revenue equals marginal costs [MR = MC]. (ii) marginal revenue minus marg

  • Q : Influence of war in prices Assume that

    Assume that the War in Iraq start to engulf other Middle-Eastern countries in hostilities. The least probable outcome of gasoline prices therefore increasing to, state, $10 per gallon in the United States, would be that: (i) Hummer sales would fall as a percentage of

  • Q : Example of temporary housing shortage

    After the change within the demand curve for housing as: (1) a temporary housing shortage may exist at R0. (2) landlords will have more complexity repaying their mortgages. (3) rental rates will fall below interest payments. (4) equilibrium