--%>

Process of Screening

A principal who checks the qualifications of a potential agent before giving the agent a contract is engaging within the process of: (i) signaling. (ii) determining an efficiency wage. (iii) predatory behavior. (iv) screening. (v) discrimination.

I need a good answer on the topic of Economics problems. Please give me your suggestion for the same by using above options.

   Related Questions in Managerial Economics

  • Q : Substituting machinery for human labor

    Substituting sophisticated machinery for human labor is termed as: (1) automation. (2) industrial sabotage. (3) kinetic engineering. (4) outsourcing. (5) robotics. Hello guys I want your advice. Please recommend some views for abov

  • Q : Accumulation of certificates of

    A potential employee’s accumulation of certificates and degrees to stimulate interest through a potential employer is termed by economists as: (1) specific training. (2) signaling. (3) general training. (4) screening. (5) ticket-punching. <

  • Q : Attributable worth cultivating The

    The theory which the economic rent on agricultural land depends upon how much extra production is gained relative to the production which could be realized on land not rather worth cultivating is attributable to: (1) Johann H. von Thünen. (2) Ada

  • Q : Determine the total Revenue from origin

    Refer to figure as sketched below. Why is the total revenue curve a ray from the origin: w) since revenue increases at an increasing rate. x) since revenue increases at a decreasing rate. y) since the firm can sell its product at a constant price. z) since the firm sh

  • Q : Explain the objectives of pricing

    Explain the objectives of pricing policy and its aim.

  • Q : Explain about perfectly price elastic

    I have a problem on perfectly price elastic supply curve that is given below: A perfectly price elastic supply curve is: (w) vertical. (x) horizontal. (y) positively sloped. (z) negatively sloped.

    Q : Define the term full cost concept

    Define the term full cost concept.

  • Q : Illustrates the environmental or

    Illustrates the environmental or external issues.

  • Q : Process of Automation Automation is the

    Automation is the process of: (1) adapting equipment which is safer for workers to operate. (2) kinetic engineering which smoothes flows of work on an assembly line. (3) scientific management of robotic factories. (4) substituting sophisticated machin

  • Q : What are the types of price

    What are the types of price discrimination?