Load test on piles
What are the main reasons to carry out the pile load test?
Expert
Load test on piles:
The main reasons to carry out the pile load test consists of:
a. In order to design other piles obtaining of back- figured data becomes easy.b. Calculation of overall cost involved in the work becomes easy due to knowledge of pile length.c. By using the pile driving and geotechnical formula the results can be counter checked.d. Structural soundness of the pile can also be checked.
Test loading:The four types of tests which are usually carried out on the piles are-
List the advantages of Hydroelectric Power Plant.
Discuss the function of a condenser?
State the phenomenon of Super Saturated Expansion in steam nozzle.
What is by Forced Circulation Boiler? What is the pressure at which the modern high pressure boilers produce steam?
Write briefly on Air Vessels.
Define the term Ton of Refrigeration.
make sure follow the marking criteria and guide lines
Explain all the types of Piles that are available in the market.
Write differences between Impulse and Reaction Turbine.
Write a brief note over the Steam Power Plant. State it's various merits and demerits.
18,76,764
1937688 Asked
3,689
Active Tutors
1418107
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!