Load test on piles:
The main reasons to carry out the pile load test consists of:
a. In order to design other piles obtaining of back- figured data becomes easy.b. Calculation of overall cost involved in the work becomes easy due to knowledge of pile length.c. By using the pile driving and geotechnical formula the results can be counter checked.d. Structural soundness of the pile can also be checked.
Test loading:The four types of tests which are usually carried out on the piles are-
Average density of soil: For the aims of civil engineering, an average soil will have a density of around 100 to 110 pounds per cubic foot. (This can differ a little depending on how well compacted the soil is).
plss make sure u choose a vacant place in new south wales. and pls confirm with the tutuor wether he has access to all softwares . bcos i dont want u saying tht u dont have software at last minute .
Write about Gas Turbines?
Explain how the intercooler reduces the power consumption of a Compressor?
Explain the difference between gravity anchorage and tunnel anchorages in suspension bridges?
Specify the effect of clearance upon the performance of air compressor?
What are the reasons to use Pile foundations during construction?
List the differences between Vapour Compression Refrigeration and Vapour Absorption Refrigeration system.
List the merits and demerits of Gas Turbines.
Explain the motive behind the coatings provided at the back faces of abutments?
18,76,764
1931490 Asked
3,689
Active Tutors
1413240
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!