Explain the Automated Software testing life cycle

Explain the Automated Software testing life cycle.

E

Expert

Verified

The Automated Software testing life cycle can be understood by following points of views:

a. Requirement or Functional Specification documents
b. Test Traceability Matrix for verifying Test Coverage
c. Test phases to be automated and percent of automation Reduced QA costs
d. Requirement or Functional Specification documents
e. Test Traceability Matrix for verifying Test Coverage
f. Test phases to be automated and percent of automation
g. Tool identification and Evaluation
h. Prepare and Base lining Scripting standard and ASTPlan
i. Coordination all along with Vendors and others
j. Test scripts or test data review and unit testing
k. Base lining within Configuration Management
l. Capture, analyze and review Test Results.

   Related Questions in Programming Languages

  • Q : Define Permission Normal 0 false false

    Normal 0 false false

  • Q : Define Out of scope Out of scope : It

    Out of scope: It is a variable is in scope as long as the program's flow of control is in the variable's defining block. Or else, this is out of scope.

  • Q : Use Finite-State Space Abstractions Use

    Use Finite-State Space Abstractions: In order to successfully apply explicit-state model checking, defects must be detectable in a sufficiently small state space. This can be achieved either by means of heuristics that constrain the way the state spac

  • Q : Limit the Use of Pre-processor

    Limit the Use of Pre-processor Directives: The C pre-processor is powerful, but unrestricted use of it can lead to code that is hard to understand and analyze. Limit its use to inclusion of header files and simple macro definitions. Avoid features suc

  • Q : Explain Operating system Operating

    Operating system: The operating system permits a computer's hardware devices to be accessed by the programs. For example, it permits data to be managed on a computer's disks in the form of a file system and it delivers the co-ordinate positions of a m

  • Q : What are the valid and invalid XHTML

    What are the valid and invalid XHTML element names?

  • Q : Introduction to Programming for

    The purpose of this assignment is to get you started with C++ programming. You'll develop simple programs (with input and output) to solve simple mathematical and engineering problems. 1. Write a program to compute the area A of an

  • Q : Define the term Scheduler Define the

    Define the term Scheduler: The portion of the Java Virtual Machine (abbreviated as JVM) which is responsible for managing the threads.

  • Q : Define the term Binary Binary : This is

    Binary: This is the number representation in base 2. In base 2, only digits 0 and 1 are utilized. Digit positions symbolize successive powers of 2.

  • Q : What is Disk drive Disk drive : It is a

    Disk drive: It is a hardware device employed to store the data. They come in numerous forms, like floppy disks, compact disks, and hard disks.

©TutorsGlobe All rights reserved 2022-2023.