Explain parasitic forces for pre-stressing
Explain parasitic forces for pre-stressing?
Expert
In the structures which are statically determinate, pre-stressing forces causes the concrete arrangements to bend upwards. Hence, pre-cambering is normally carried out to counteract such effect and make it more pleasant in looks. For statically undetermined structures the deformation of concrete members are restrained by the supports and consequently parasitic forces are developed by the pre-stressing force in addition to the bending moment generated by eccentricity of pre-stressing tendons. The developed forces at the support modify the reactions of concrete members subjected to external loads and produces secondary moments (or parasitic moments) in the structure.
Explain about the principle used in chain surveying and specify its limitations.
What is meant by Dry Ice Refrigeration?
Discuss function of Carburetor?
Explain about Machine moulding?
Assignment 2 – Problem Solving Task – Contractual Duties and Responsibilities for Construction Failure and Dispute Resolution Type: Individual assignment Due: Week 11 Wednesday 11th October 2012 6pm Weight: 30% overall of the unit Penalty for Late Submission: 3% per each day You are required
How does deck equipment (median dividers and parapets) affect the aerodynamic response of long-span bridges?
What is meant by the Prime Mover ?
Explain the difference between gravity anchorage and tunnel anchorages in suspension bridges?
Write down the functions of a lubrication system in the IC engines?
What is by Forced Circulation Boiler? What is the pressure at which the modern high pressure boilers produce steam?
18,76,764
1949154 Asked
3,689
Active Tutors
1430186
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!