Drawbacks of classic life cycle model
Write down all the drawbacks of classic life cycle model. Briefly illustrate it.
Expert
The drawbacks of classic life cycle model are as follows:
a) Real projects seldom follow the sequential flow. Iteration always takes place and generates problem.
b) Difficult for the customer to illustrate all the requirements.
c) The working version of program is not available. Therefore the customer should have patience.
When P is a risk probability, L is the loss, and then Risk Exposure (or RE) is evaluated as: (1) RE = P/L (2) RE = P*L (3) RE = P + L (4) RE = 2* P *L How can I solve my above Software Engineering problem? Please suggest me the acc
Define the term design process. Briefly illustrate the term?
Write down in brief the different views in the UML?
Explain the term SRS.
What do you mean by the term Coupling? Briefly define it.
Describe about requirement traceability and explain its importance?
What do you mean by the term Equivalence Partition? Briefly explain it.
State the difference between the static and dynamic testing?
Give explanation about exploratory testing?
Explain the acceptance testing?
18,76,764
1928715 Asked
3,689
Active Tutors
1441731
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!