Define Work Breakdown Structure or WBS

Work Breakdown Structure (WBS):
A) Defines each and every element of the project in a hierarchical framework

B) Helps with accountability:

  • facilitates the setting (and, later, the evaluation) of cost, time of quality performance targets at all levels in the organization.

C) Needs to integrate with the organization (structure and processes)

D) Forms the basis of coding of project elements and work packages

  • (e.g. 1; 1.1; 1.1.2; 1.1.2.5; etc)

   Related Questions in Biology

  • Q : Performance analysis & testing

    Performance analysis & testing: What distinguishes engineers from technicians is largely the ability to formulate and carry out the detailed calculations of forces and deflections, concentrations and flows, voltages andcurrents, that are required

  • Q : Kind of chemical bond maintaining pair

    Which kind of chemical bond maintains the pairing of each and every chain in the DNA molecule?

  • Q : What is secondary immune response What

    What is secondary immune response?

  • Q : Sound and sound perception What do you

    What do you mean by the term sound and sound perception? Briefly describe both the terms.

  • Q : What is type fourth hypersensitivity

    What do you mean by type IV hypersensitivity?

  • Q : What is xaxim What is meant by the

    What is meant by the xaxim?

  • Q : Define Local Area Network or LAN Local

    Local Area Network (LAN): It supplies networking capability to a group of computers in close immediacy to each other like in an office building, a school, or a home. The LAN is helpful for sharing resources such as printers, files, games or other appl

  • Q : Expectancy Theories - Motivation -

    The expectancy model is based upon the belief that motivation is determined by the nature of the reward people expect to germ as a result of their job performance. The underlying assumption is that a man is a rational being and will try to maximize his perceived value of such rewards. He will cho

  • Q : Describe Materials Planning Materials

    Materials Planning: It is the planning and control of functions supporting the complete cycle (that is, flow) of materials, and the related flow of information. Such functions comprise (A) identification, (B) cataloging, (C) standardization, (D) requi

  • Q : Treatment of hemophilia Illustrate out

    Illustrate out the treatment of hemophilia? Why hemophilia uncommon in females?