--%>

breakfast program

if the average is 0.27 and we have $500 how much break fastest will we serve by 2 weeks

   Related Questions in Mathematics

  • Q : Relationships Between Data Introduction

    Relationships Between Data - Introduction to Linear Regression Simple Regression Notes If you need guidance in terms of using Excel to run regressions, check pages 1 - 10 of the Excel - Linear Regression Tutorial posted to th

  • Q : Explain the work and model proposed by

    Explain the work and model proposed by Richardson.

  • Q : What is the probability that the film

    T.C.Fox, marketing director for Metro-Goldmine Motion Pictures, believes that the studio's upcoming release has a 60 percent chance of being a hit, a 25 percent chance of being a moderate success, and a 15 percent chance of being a flop. To test the accuracy of his op

  • Q : Abstract Boolean Algebra I. Boolean

    I. Boolean Algebra Define an abstract Boolean Algebra, B,  as follows:  The three operations are:  +   ( x + y addition) ( x y multiplic

  • Q : Bolzano-Weierstrass property The

    The Bolzano-Weierstrass property does not hold in C[0, ¶] for the infinite set A ={sinnx:n<N} : A is infinite; Show that has no “ limit points”.

  • Q : Abstract Algebra let a, b, c, d be

    let a, b, c, d be integers. Prove the following statements: (a) if a|b and b|c. (b) if a|b and ac|bd. (c) if d|a and d|b then d|(xa+yb) for any x, y EZ

  • Q : Law of iterated expectations for

     Prove the law of iterated expectations for continuous random variables. 2. Prove that the bounds in Chebyshev's theorem cannot be improved upon. I.e., provide a distribution that satisfies the bounds exactly for k ≥1, show that it satisfies the bounds exactly, and draw its PDF. T

  • Q : Statistics math Detailed explanation of

    Detailed explanation of requirements for Part C-1 The assignment states the following requirement for Part 1, which is due at the end of Week 4: “Choose a topic from your field of study. Keep in mind you will need to collect at least [sic] 3- points of data for this project. Construct the sheet y

  • Q : Formulating linear program of an oil

    An oil company blends two input streams of crude oil products alkylate and catalytic cracked to meet demand for weekly contracts for regular (12,000 barrels) mind grade ( 7,500) and premium ( 4,500 barrels) gasoline’s . each week they can purchase up to 15, 000

  • Q : Area Functions & Theorem Area Functions

    Area Functions 1. (a) Draw the line y = 2t + 1 and use geometry to find the area under this line, above the t - axis, and between the vertical lines t = 1 and t = 3. (b) If x > 1, let A(x) be the area of the region that lies under the line y = 2t + 1 between t