--%>

Arena

Are you able to assist with these two assignments in Arena simulation below? You can use the Basic Process instead of Blocks and Elements. An office of state license bureau has two types of arrivals. Individuals interested in purchasing new plates are characterized to have inter-arrival times distributed as EXPO(6.8) and service times as TRIA(808, 13.7, 15.2); all times are in minutes. Individuals who want to renew or apply for a new driver’s license have inter-arrival times distributed as EXPO(8.7) and service times as TRIA(16.7, 20.5, 29.2). The office has two lines, one for each customer type. The office has five clerks: two devoted to plates (Mary and Kathy), two devoted to licenses (Sue and Jean), and the team leader (Neil) who can serve both customer types. Neil will serve the customer who has been waiting the longest. Assume that all clerks are available all the time for the eight-hour day. Note that when entities from the front of multiple FIFO queues (corresponding to multiple Process modules) try to seize the same Resource, the logic to select which entity “wins” is as though all the queues were merged together into a single FIFO queue. Observe the system or cycle time for both customer types. The office described in exercise above, is considering cross-training Kathy so she can serve both customer types. Modify the model to represent this, and see what effect this has on system time by customer.

   Related Questions in Mechanical Engineering

  • Q : How do you repair a hydraulic jack How

    How do you repair a hydraulic jack?

  • Q : Convection Heat Transfer Please Solve

    Please Solve this problem Step by step, and the question is in the images.

  • Q : Measuring the Temperature in Wet Bulb

    Explain phenomenon to measure the Temperature in Wet Bulb Thermometer?

  • Q : Quantity in Product design specification

    Quantity: The total quantity of the product predicted and, more importantly, the production rates and batch sizes needed, should be specified. This will have implications for the types of manufacturing equipment and work organization necessary. It wil

  • Q : Maintenance in Product design

    Maintenance: How frequently and easily the product is to be maintained must be specified. A photocopier shouldn't require a service call from a technician just to add toner. If the product is to be maintenance free, then costs may be increased due to

  • Q : Laws of Thermodynamics Describe all the

    Describe all the laws of the Thermodynamics?

  • Q : Difference between projectile motion

    Difference between projectile motion and rocket motion:A projectile has no motor or rocket on it, therefore all of its momentum is provided to it as it is launched. An illustration of a projectile would be pen which you throw across a room.

  • Q : Describe Process Flow Diagram Process

    Process Flow Diagram: A Process Flow Diagram or System Flow Diagram exhibits the relationships among the main components in the system. It too has fundamental information regarding the material balance for the process.

  • Q : Synchronous generator & Generating units

    Question 1: Three generating units operating in parallel at 60 Hz have rating of 300, 500, and 600    MW and have speed-droop characteristics of 5, 4, and 3%, respectively. Due to a change in load, a

  • Q : Efficient use of waste heat and

    Efficient use of waste heat and renewable heat sources 1. Describe how you might recover heat from (a) a process exhaust gas stream (e.g. from an oven) and (b) a process warm water stream (e.